After you receive your development approval and conditions, you may also need to lodge an operational works application:

Operational work is the construction of infrastructure that affects a property or its use. This does not include building, plumbing or drainage work. It is normally work as part of a material change of use or reconfiguration of a lot development approval.

The Sunshine Coast Planning Scheme 2014 table 5.8.1 provides details about assessment of operational work.

You may need a operational work approval for works such as:

Engineering civil works

Engineering civil works

Civil works relates to infrastructure associated with utilities, water and transport such as:

  • road works and stormwater
  • access driveways, vehicle movement and car parking
  • electrical reticulation, telecommunication and street lighting
  • frontage works i.e. roads, kerbing, footpaths.

You may need to consult with the relevant utility providers as part of your civil works.

temporary works permit for work in the road or verge is not required where an operational works approval is in place.

Electrical work

Electrical work

Electrical work relates to the design and provision of outdoor lighting for roads, pathways and car parking areas.

Filling and excavation

Filling and excavation

Filling and excavation are any type of earthworks. Earthworks is the removal or importation of material to or from a lot. It is also relocation of material within a lot that will change the ground level of the land.

Council's fact sheets have details on when you may need approval for this work:

Landscape work

Landscape work

Landscape work is the design of public and private recreational areas, open space and streetscapes. This includes the selection of plants.

Read our information on tree and vegetation management.

Tidal works

Tidal works

Tidal works relates to work carried out in canals or natural waterways. This includes pontoons, jetties, decks, boat ramps and landings.

Read more about tidal works.

Vegetation rehabilitation and clearing work

Vegetation rehabilitation and clearing work

Any proposed work involving vegetation clearing or environmental rehabilitation associated with a development. This type of work is assessed as part of the development application.

Refer to council's vegetation clearing page for more information.

Making an operational work application

To make an operational work application, use the relevant development assessment forms.

The DA Rules specify how applications are assessed and decided. Your application may also need: 

  • referral to the State Assessment and Referral Agency (SARA)
  • assessment by other entities such as Queensland Fire and Emergency Services.

Development advice can help you understand what information you may need to provide with your application. You can also use our well made application and code checklists. Find out about lodging a development application.

Infrastructure built as part of a development approval can be public or private.

Public infrastructure and facilities are called ‘contributed assets’ and can include:

  • roads and footpaths
  • parks and playgrounds
  • streetscape and furniture
  • stormwater drainage
  • street lighting.

Public infrastructure must be built safe and fit for purpose for the community to use. To ensure this, it needs to follow a detailed council inspection, maintenance and acceptance process.

Private infrastructure built as part of a development approval does not follow this process. It is the developer's responsibility to construct this infrastructure. They must have it inspected and certified by a certified professional. This is to ensure compliance with conditions of a development approval.

To find out more go to operational work construction.